查看: 907|回复: 1

When will intel meteor lake models be ready?

[复制链接]

23

Threads

66

Posts

309

Credits

Full Member

Rank: 3Rank: 3

Credits
309
发表于 2023-10-28 01:14:24 | 显示全部楼层 |阅读模式
Anyone know when Beelink might have SEI models with meteor lake available?

Looks like:

- Core Ultra 7 155u (6+8+2) / 15w
- Core Ultra 5 125h/135h (4+8+2) / 28-35w
- Core Ultra 7 155h/165h/185h (6+8+2) / 28-35w

I'm not even sure what those last + 2 cores are on these new chiplet based chips. Seems like 2 of the e-cores are on the chiplet or something vs other e-cores.

  • Compute tile - Containing both P-cores (Redwood Cove) and E-cores (Crestmont). Manufactured on Intel 4 process node.
  • SoC tile - Containing traditional uncore components, a new AI engine called an NPU, a media block, the memory controller, and the Low Power Island—more on this in a moment. Manufactured by TSMC.
  • Graphics tile - Containing an Intel Xe-LPG GPU with 8 Xe-cores, ray tracing support, and many shared features with existing Xe-HPG graphics cards (Alchemist). Built on TSMC N5 process node.
  • IO tile - Thunderbolt and PCIe Gen 5 connectivity. Manufactured by TSMC.
  • Base tile/die/interposer - Intel doesn't always refer to this as one of Meteor Lake's tiles—it's an interposer—but it is absolutely key to holding this chip together.


回复

使用道具 举报

6

Threads

2431

Posts

7587

Credits

Super Moderator

Rank: 8Rank: 8

Credits
7587
发表于 2023-10-30 19:23:04 | 显示全部楼层
Hello there,

We do not have this plan yet.
Please check  our official site by then.
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | Sign up

本版积分规则

快速回复 返回顶部 返回列表