查看: 1081|回复: 1

When will intel meteor lake models be ready?

[复制链接]

23

Threads

66

Posts

309

Credits

Full Member

Rank: 3Rank: 3

Credits
309
发表于 2023-10-28 01:14:24 | 显示全部楼层 |阅读模式
Anyone know when Beelink might have SEI models with meteor lake available?

Looks like:

- Core Ultra 7 155u (6+8+2) / 15w
- Core Ultra 5 125h/135h (4+8+2) / 28-35w
- Core Ultra 7 155h/165h/185h (6+8+2) / 28-35w

I'm not even sure what those last + 2 cores are on these new chiplet based chips. Seems like 2 of the e-cores are on the chiplet or something vs other e-cores.

  • Compute tile - Containing both P-cores (Redwood Cove) and E-cores (Crestmont). Manufactured on Intel 4 process node.
  • SoC tile - Containing traditional uncore components, a new AI engine called an NPU, a media block, the memory controller, and the Low Power Island—more on this in a moment. Manufactured by TSMC.
  • Graphics tile - Containing an Intel Xe-LPG GPU with 8 Xe-cores, ray tracing support, and many shared features with existing Xe-HPG graphics cards (Alchemist). Built on TSMC N5 process node.
  • IO tile - Thunderbolt and PCIe Gen 5 connectivity. Manufactured by TSMC.
  • Base tile/die/interposer - Intel doesn't always refer to this as one of Meteor Lake's tiles—it's an interposer—but it is absolutely key to holding this chip together.


回复

使用道具 举报

10

Threads

2478

Posts

7767

Credits

Super Moderator

Rank: 8Rank: 8

Credits
7767
发表于 2023-10-30 19:23:04 | 显示全部楼层
Hello there,

We do not have this plan yet.
Please check  our official site by then.
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | Sign up

本版积分规则

快速回复 返回顶部 返回列表